This site or third-party tools used by this make use of cookies necessary for the operation and useful for the purposes outlined in the cookie policy. If you want to learn more or opt out of all or some cookies. By closing this banner, scrolling this page, clicking on a link or continuing navigation in any other way, you consent to the use of cookies. X

Waste Water Treatment Plant Trento 3

KEY FACTS

Services:
Masterplan and Concept
Schematic Design
Detail and Construction Docs
Tender Phase

Location:
Trento

Country:
Italy

Client:
Autonomous Province of Trento

Completion Date:
Ongoing

The assignment is mainly composed of two elements:
1) A pumping station: a big pump that, following a coarse filtering of the waste waters, lifts the sewage to treatment plant. It’s an underground large tank for collecting and filtering raw waters that is placed in the river Adige’s valley.
2) The treatment plant that treats waste water and returns them as clean water. It is a huge building containing large and very complex equipment. The treatment plant is located close to the base of the mountain, partially covering the site of a previous quarry and will be completely covered with earth.
The peculiar position of the works required a special attention to the landscape.

The WWTP treats civil sewage (150,000 E. Inh with future upgrading to 300,000 E.Inh) and is characterized by the following sections: clarification, biological treatment with high-performance systems and tertiary treatment.

Studio Altieri S.p.A. - Company subject to the direction and control of Italconsult S.p.A.
Registered office: Via Colleoni, 56/58 - 36016, Thiene (VI), Italy
VAT Reg. and Tax Code no. 03100790249 - R.E.A. of Vicenza no. 298855 - Share Capital: € 8,400,000.00
Certified email address: altieri@pec.studioaltieri.it
sitemap