This site or third-party tools used by this make use of cookies necessary for the operation and useful for the purposes outlined in the cookie policy. If you want to learn more or opt out of all or some cookies. By closing this banner, scrolling this page, clicking on a link or continuing navigation in any other way, you consent to the use of cookies. X

Detailed design of the sewage treatment plant in the Municipality of Avola

KEY FACTS

Services:
Final and Detailed Design
Topographical Survey
Geological Study
Geoelectrical Study
Geotechnical Study
Safety Plan during Design Phase

Location:
Sicily

Country:
Italy

Client:
Impresa SLED S.p.A.
Municipality of Avola

Completion Date:
2007

The project foresaw the construction of the waste water treatment plant of Avola.
In particular the assignment included:
- the construction of a new sewage network to direct to the new WWTP the waste waters that used to be drained into the sea;
- a new pumping station;
- the discharge pipe of the new WWTP (on land and under water pipe);

Main technical information:
WWTP:
- Population served: 40,000  equivalent inhabitants
- Average daily discharge: 11,200 mc/d
- Main pipe: 1,1 km diameter da 400 a 800 mm
- Sub marine pipe: 0.5 km diameter 710 mm
- pressure: 1,2 km diameter 400 mm.

Studio Altieri S.p.A. - Company subject to the direction and control of Italconsult S.p.A.
Registered office: Via Colleoni, 56/58 - 36016, Thiene (VI), Italy
VAT Reg. and Tax Code no. 03100790249 - R.E.A. of Vicenza no. 298855 - Share Capital: € 8,400,000.00
Certified email address: altieri@pec.studioaltieri.it
sitemap